JM FORMWORK
Reinforced Concrete Specialists
SAFETY, QUALITY
AND ON TIME
MORE INFO

ABOUT
We are a company that specialises in steel fixing, shuttering and concreting. We also undertake groundwork in association with the works above as part of any package.
​
JMF was started in 2010. The first project was a pre- cast, fair faced subway for Birse Rail, with a deadline of 6 weeks due to penalty clauses. We completed this in four and a half weeks. This speed and quality of work has continued from then on, consistently exceeding the main contractor's demands.
​
We pride ourselves on quality workmanship, delivered safely and always on time.
The success of this company is due to the experience of the owner and his highly trained employees.
​
We operate in both public and private sectors. From office and commercial, to residential and industrial.

CUSTOMER FOCUS
At JMF we believe in working closely with our customers/ clients to ensure that every requirement is met and that they are informed at all stages of the project. We will also offer expert advice, options and solutions.
OUR SERVICES
At JM Formwork we offer a wide range of services each completed to a high standard by our team of skilled workers.
​
These include:

CONCRETE CONSTRUCTION
Basements
Swimming pools
Bridges
Retaining walls
Subways
Staircases
Capping beams
Lift shafts

CONCRETE REPAIR &
FINISHING
Finished facework
Refurbishing
Under pinning
Waterproofing
Foundation repairs
ENABLING/ TEMPORARY
WORKS
Crane bases
Thrust blocks
Props and walers

PRE CAST CONCRETE
MANUFACTURING
Concrete barriers
Retaining walls
Parapets
Stairs
Subways

STEEL FIXING & FORMWORK
Timber formwoking
Steel fixing and reinforcing
PROJECTS
Four storey high reinforced concrete lift shaft with sand blasted timber effect.
Construction of a basement slab and walls for the house.
Plus radius garden walls and planters for the garden. With stairs.
Construction of power floated slabs. with plinths and walls. 1500m3 concrete in total.
A precast concrete subway structure
A seven story double lift shaft and stair well constructed within an existing building
A reinforced concrete structure cladded in timber with stairs
A temporary foot bridge constructed in timber
An extension to two art gallery buildings
A precast retaining wall
A radius reinforced beam foundation for a mausoleum
A reinforced concrete retaining wall inside a recycling centre
A reinforced concrete beam with bollard anchorage posts

HEALTH & SAFETY
Safety is a key concern in every job undertake. It is at the forefront of all our operations, from training, monitoring and inspections of all works carried out from the start to finish of every project. We strive at all times to meet our responsibilities and obligations to keep our employees and the public as safe as we possibly can.
Site Safety:
​
At JMF we treat all sites with the same respect as far as safety is concerned. Every site is assessed individually to make sure there is no complacency and regularly reassessed to maintain the safety of our employees and the public.
Equipment:
All equipment is routinely checked. All power tools are regularly PAT tested and all safety equipment worn by JMF employees is of the highest quality.
ENVIRONMENT
At JMF we take our environmental commitments very seriously. We recognise that every project could have a potential impact on the local community and environment. So, we at JMF will try our upmost to prevent any upset or discomfort.
We insist on segregating scrap materials, placing all plant on drip trays with spill kits close to hand, cleaning and reusing materials and keeping noise to an absolute minimum.
CONTACT
Enquiries
For any enquiries please call: 07832 338522
or fill out the following form
Tel:
07832 338522